Maseru City Construction Permit
Fees For All Construction Procedure
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Construction Permit: How to determine the Construction Permit Application Fee
[[Buildup Area * Rate * 0.1] / 100 ] + v.a.t
Rate is a standard cost depending on the type of development as described below
Corrugated shelter/Iron shack = M1500
Residential Houses:
Small Brick House = M1600
Block + Tile Roof = M1700
Face Brick + Tile Roof = M1800
Double Storey = M2100
Mall = M2800
Industrial = M3500
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Water and Sewer Connection Process & Fees:
http://www.wasco.co.ls/new-water-connections/
http://www.wasco.co.ls/new-sewer-connections/
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Electricity Connection Process & Fees:
https://www.lec.co.ls/services