---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Construction Permit: How to determine the Construction Permit Application Fee

[[Buildup Area * Rate * 0.1] / 100 ] + v.a.t

Rate is a standard cost depending on the type of development as described below

Corrugated shelter/Iron shack = M1500

Residential Houses:

       Small Brick House            = M1600

       Block + Tile Roof              = M1700

       Face Brick + Tile Roof      = M1800          

Double Storey                         = M2100

Mall                                          = M2800

Industrial                                  = M3500

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Water and Sewer Connection Process & Fees:

http://www.wasco.co.ls/new-water-connections/

http://www.wasco.co.ls/new-sewer-connections/

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Electricity Connection Process & Fees:

https://www.lec.co.ls/services